B) For street performs presently in Procedure, the upkeep contractor, management and operation contractor shall take duty to get ready files prescribed in level k, l, m and n in clause 1 in this Article and become issue to inspection conducted by highway work operator, supervisor or user. b) Damage https://spencertvusq.atualblog.com/24679082/indicators-on-phân-cấp-đường-bộ-giao-thông-you-should-know