The length from the zimbra migration depends upon several factors including the quantity of data to generally be migrated, the pace of your network, as well as the efficiency in the source and desired destination servers. Cutover: You must manually take out the domain within the resource tenant, connect it https://www.hostscheap.com/zimbra-migration-service