Penmann successfully delivered a significant HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a purpose-built ventilation and climate control system built to comply with demanding hygiene and production criteria. The contract covered the design, supply, installation and commissioning of advanced HVAC systems across non-production, Medium Care (MC) and High Care https://ezmarkbookmarks.com/story20769727/penmann-completes-major-hvac-upgrade-for-nutricia-s-liverpool-site-supporting-fsi-phase-1-2